The Machupicchu carrying capacity study is being prepared by ARS Progetti for the Government of Peru, and Carlos Ortet sits on that team in a personal capacity. What we set out here is the method, which is our own ground: what has to happen to the data before anyone touches a model.

What we found

  • The carrying capacity and Limits of Acceptable Change study for the Historic Sanctuary of Machupicchu has a 190-calendar-day execution period and is due to conclude in the first half of 2027. ARS Progetti is preparing it for the Government of Peru, and 498 Advance is neither a contracting party nor a subcontractor.
  • The basis for the calculation was settled in 2017: Decision 41 COM 7B.36 of the World Heritage Committee asked the Peruvian State to review carrying capacities against conservation needs and tie them to defined indicators. Nine years on, it still frames the assignment.
  • Every indicator entering an evidence system declares five fields before anyone opens a model: source, meaning, quality, update frequency and institutional owner. That is the discipline the first field mission started with, in August 2026.

Anyone reviewing a dossier asks the same things: where does that figure come from, who answers for it, and what happened during the weeks the counter was switched off. If those answers are not written down before the analytics start, the handsomest dashboard lasts exactly as long as the meeting does.

August 2026 saw the first field mission of the new carrying capacity and Limits of Acceptable Change study for the Historic Sanctuary of Machupicchu. The ultimate recipient of that dossier is the World Heritage Committee, which raises the bar considerably for what counts as a defensible piece of data.

01Who signs what, and who does not#

Worth clearing up before going any further, because this is the sort of thing that gets misread.

The study belongs to the Government of Peru. MINCETUR launched it with the Ministry of Culture and SERNANP, and the party preparing it is ARS Progetti SPA, the Rome-based consultancy that holds the assignment. Execution runs to 190 calendar days and the study is due to conclude in the first half of 2027, across four phases: planning and inception; diagnosis and baseline; evaluation and modelling; and final proposal and implementation. The scope is set by MINCETUR's public announcement, which covers visitor flows, territorial conditions, the conservation of cultural and natural heritage, and tourism services, in line with the SHM-PANM Master Plan 2026-2031.

Carlos Ortet sits on the international ARS Progetti team as the expert in informatics and territorial information systems. The appointment is personal, verified by a letter from ARS Progetti itself dated 17 August 2026, and it neither comes through 498 Advance nor involves it.

Who does what in the carrying capacity study for the Historic Sanctuary of Machupicchu
WhoRole in the study
Government of PeruCommissions the study and owns it. MINCETUR launched it with the Ministry of Culture and SERNANP
ARS Progetti SPAContractor. Prepares the study from Rome with an international team
Carlos OrtetExpert in informatics and territorial information systems within that team. Personal appointment
498 AdvanceNone. Neither a contracting party nor a subcontractor, and takes no part in the study

What follows is general method, and any team is welcome to take from it whatever suits. No data from the study, no visitor figures and no preliminary findings appear here.

02Conservation outranks visitor numbers#

Machupicchu has been on the World Heritage List since 1983 as a mixed property, cultural and natural. Its Outstanding Universal Value, the OUV, obliges every management decision to be justified by its effect on the attributes of the property.

That framework has already corrected the calculation once. The 2017 Reactive Monitoring mission, with the World Heritage Centre, ICOMOS, IUCN and ICCROM, observed that capacity for the Llaqta was being worked out largely from tourism demand and visitor experience, and asked for long-term effects on the property to be taken into account: erosion, disturbance to fauna, impacts on flora, waste, pollution. The Committee took up the criterion in Decision 41 COM 7B.36 and asked the Peruvian State to review carrying capacities against conservation needs, apply clear visitor limits, define a vision based on OUV attributes, and link it to an integrated natural and cultural monitoring system with defined indicators.

For whoever designs the information system, that changes what the assignment is really about. A fixed capacity figure ages badly and is hard to audit: the moment seasonality shifts, or the condition of a stretch of path changes, or the rainfall regime moves, the number stops meaning the same thing. What is being asked for is an adaptive management instrument, fed by evidence, with thresholds, alerts and continuous observation.

03Traceability before analytics#

Before any advanced analytics, remote sensing, GIS or model of any kind, five things get declared for every piece of data: where it comes from, what exactly it means, the quality it arrives with, how often it is updated, and who inside the institution answers for it.

It looks like paperwork, and it is what separates a dashboard from a source of evidence. Take something as innocent as "visitors today". That can mean tickets sold, tickets validated, people crossing a control point, or an estimate from an automatic count. The four figures differ, all four are reasonable, and none of them is any use if the document does not say which one it is using. When two sources carrying the same label disagree, and they always end up disagreeing, the conversation spends three weeks on where the number came from instead of on the management problem.

Historical series behave much the same. A series with gaps that are not marked as gaps produces false averages that nobody spots until someone asks about a particular month. A change of sensor, or of detection threshold, left out of the data dictionary, leaves a step in the series that somebody will read as a trend months later.

And one part of this no technology fixes: every indicator needs an institutional owner, named by post rather than by person. Data with nobody accountable for it decays on its own.

Technical detail · what goes on an indicator's record card

Name and operational definition, in a sentence that cannot be read two ways. Unit and method of calculation. Spatial and temporal coverage, at the real resolution rather than the theoretical one. Capture method, with the specific equipment or source. Known quality: biases, failure rate, declared gaps. Latency between the event and the data being available. Institutional owner, by post. And a version stamped with the date of the last change of definition, the field most often forgotten and the one that saves the most argument two years later.

Translucent green layers stacked in steps, with vegetation growing along the edges, seen at an angle
Data layers over a living territory: each stratum declared separately · Source: 498A, September 2026

04Assumptions get written down, not remembered#

Every flow model carries assumptions inside it: dwell times by sector, how arrivals spread across the day, behaviour at junctions and pinch points, the usable capacity of a stretch of path, which almost never matches the geometric one.

No assumption is a problem while it is written down. What ruins a dossier is the assumption that lives inside the code and never reaches the output, because it turns a modelling decision into an apparent fact.

So every scenario comes with its assumptions sheet and its sensitivity analysis alongside: what happens to the result if mean dwell time rises, if the split between entrances changes, if building work narrows the usable width of a stretch. When the conclusion flips as an assumption moves within its plausible range, the conclusion is the assumption, and the report has to say so.

05Simulation earns its keep once it is calibrated#

Flow simulation is the part everyone gets excited about and the part that most easily runs away with you. Agent-based models have spent decades answering a question that fits well here: what happens when many individual decisions produce collective dynamics. We have written about their history and their limits in another article.

There is a lesson that took us years to learn inside a theme park and that applies just as well at a heritage site. The queue for a ride behaves a lot like a textbook model: M/M/1 fits the profile reasonably well, and a ride that dispatches in cycles comes closer still to batch service. Then a Saturday in August arrives. One person hides behind another, the line goes three abreast and three seconds later five abreast, it bunches at the turns, someone hops the barrier, someone is carrying a child. Each of those anomalies injects an error the theoretical model knows nothing about, and they all turn up at once at peak time, which is exactly when the number is needed.

Hence the calibration rule we work to: the model has to reproduce an observed period that was not used to fit it, before anyone asks it about a scenario that has not happened yet. And the error range gets published next to the result, not in an annex.

Flows can be studied without turning visitors into identifiable objects. Counting people without identifying them is privacy by design as a working rule: aggregation by cell and time band, the lowest resolution that will do, short retention, and no link to ticketing or loyalty identifiers. There is a technical reason behind it. A detailed individual trajectory, with its entry time, its particular corridor and its four minutes of dwell, can single out a person even if their face was never recorded. Article 35(3)(c) of the GDPR requires an impact assessment where a publicly accessible area is systematically monitored on a large scale, and EDPB Guidelines 3/2019 explain at some length why.

06An output a public body can audit#

The acid test is easy to state and hard to pass: someone outside the team, with the dossier in front of them, has to be able to redo the calculation and end up in the same place.

That means delivering rather more than a dashboard. Indicators with their threshold and their record card. Series with the gaps declared. Scenarios with their assumptions and their sensitivity. Model parameters, versioned. And a log of what changed, when and why. The dashboard is the way in to all of it.

The system recommends, alerts and simulates. The decision on how many people enter the Llaqta on a Tuesday in February stays human and institutional, and it has to be explainable without opening a computer.

07What we do with this at 498A#

None of the above is peculiar to heritage. It is the same order of work we apply when the object of study is a brand: build the evidence base, declare the assumptions, measure the results, and stop an automated output from passing for judgement.

In GEORadar that means the methodology travels with the study. Between 6,000 and 30,000 custom prompts per brand, seven surfaces measured separately, and the method documented so the client can repeat the measurement without us. A visibility number with no corpus and no method behind it can be shown, but it cannot be defended, much like a capacity figure with no conservation indicators.

The engineering that holds up assignments of this kind (models that run where the data cannot leave, in-house datasets with expert annotation, multi-agent systems to orchestrate capture and quality control) sits under our capabilities. And what is still an open question, such as calibrating flow models from short series, we work on in research with UAB and IIIA-CSIC.

None of this is eye-catching, and it takes up most of the calendar on a project like this. The part that gets shown in a presentation comes last, and it is usually the shortest.

Originally published on carlosortet.com

An earlier version of this text was published on carlosortet.com.

Sources
  1. ARS Progetti SPA. Letter verifying the appointment of Carlos Ortet, 17 August 2026. https://carlosortet.com/evidence/ars-progetti-carlos-ortet-machupicchu-verification-2026.pdf
  2. MINCETUR. New carrying capacity study will bring order and sustainability to tourism at Machupicchu, 17 August 2026. https://www.gob.pe/institucion/mincetur/noticias/1431511-mincetur-nuevo-estudio-de-capacidad-de-carga-permitira-ordenar-y-hacer-sostenible-el-turismo-en-machupicchu
  3. World Heritage Centre, ICOMOS, IUCN and ICCROM. Report on the Reactive Monitoring mission to the Historic Sanctuary of Machu Picchu, 2017. https://whc.unesco.org/document/158632
  4. World Heritage Committee. Decision 41 COM 7B.36, 2017. https://whc.unesco.org/en/decisions/7038/
  5. UNESCO. Historic Sanctuary of Machu Picchu, inscribed on the World Heritage List in 1983 as a mixed property. https://whc.unesco.org/en/list/274/
  6. Regulation (EU) 2016/679, Article 35(3)(c), and European Data Protection Board Guidelines 3/2019 on processing of personal data through video devices. https://eur-lex.europa.eu/eli/reg/2016/679/oj
Carlos Ortet